Thursday, 09 July 2026
The Trust is aware of posts on social media which pose some pertinent questions about how the Trust operates and manages the Community Benefit Funds it receives. We are pleased to offer the following information in response to these questions to demonstrate our transparency to provide information and our accountability for the actions, decisions and policies we have put in place to operate our business.
1. The Trust
Stratherrick & Foyers Community Trust (SFCT) is a not-for-profit community company established in 2004 by the Stratherrick and Foyers Community Council to receive and distribute the Community Benefit Funds received from Energy companies (e.g. Wind Farm and Hydro scheme firms) operating in our geographical area. The aim of the Trust is to help ensure the environmental protection, wellbeing and economic sustainability of all parts of the community area that may be affected by any “Green Energy'' developments.
The Community Trust does not own the funds but manages Community Benefit Funds on behalf of the energy companies. These funds come with specific rules and eligibility criteria, and the Trust is required to follow robust governance and reporting procedures to ensure the funds are used responsibly and for the benefit of the community.
Our Vision Statement is:
“We will act to enhance the quality of lives of people by engaging with the issues that matter to the community and by supporting people, at a sustainable level (i.e. with finance, personal time, specific knowledge etc.) to help people make things happen.”
We are guided by our ‘Articles of Association’ which include our Vision, both of which determine what we do and how we behave:
- To prevent or relieve poverty
- To advance education, training and/or retraining
- To advance heritage
- To advance environmental protection and improvement
- To advance citizenship and/or community development
- To advance the provision of recreational facilities
We are listed at Companies House, as a Company Limited by Guarantee (CLG) and abide by all relevant company legislation including producing annual accounts, sound financial planning and control, directors' duties, the holding of regular member meetings and keeping a proper register of members. There are currently 9 Directors of the Trust, all are volunteers and members of the community. We are always looking for volunteer Directors and would welcome any new applications to become a Director of SFCT.
As an operational organisation the Trust must also meet regulatory and statutory requirements (e.g. Health & Safety, Human Resources regulations, GDPR et al.). In addition, we are obliged to produce reports to our Funders on a regular basis.
2. Staffing
2.1 Summary
The current Team is made up of 10 staff members, nine are part-time and one full time. In total they deliver 5.55 Full Time Equivalent (FTE) of effort. Staffing has changed over the years in line with the needs of the Trust during any particular period. Over the last 18 months, the number of staff has reduced with the loss of a Comms & Marketing Officer and a Funding Officer. During the current period we have tried to balance staffing levels against the statutory rises in National Insurance, Living Wage and rising pension cost.
2.2 Details
As a CLG, there are mandatory and regulatory requirements we must perform as a company. To fulfil these company related requirements, we have three internal financial, HR and administrative Team members delivering 1.25FTE hours.
To maintain the community assets the Trust has built up over the years (e.g. Wildside Centre, Foyers Toilets and Bay) we employ a Maintenance Officer and two cleaning staff who deliver 1.2FTE hours.
There are three Team members, delivering 2.1FTE hours, dedicated to community facing roles (Comms & Media Officer, Funding & Development Officer and Project Coordinator). These roles involve keeping the community informed, securing additional funding, and initiating and coordinating the projects agreed by the Board amongst many other responsibilities including organising community events, the community mini-bus service and support our community grant process, which is a large part of what the organisation does.
The final member of the Team is the Chief Executive Officer who is the only full-time staff member. Her role is viewed as 50% company related operational management, i.e. financial processes, regulatory processes (HR, H&S, fire, insurance etc.) and funder reporting; and 50% community facing ensuring that the communities are informed, grants approved and distributed and projects progressed and completed.
Many of the Team members are long standing local community members working part-time hours. They all work very hard to fulfil their roles and support the community which often means working evenings and weekends and frequently being called out of hours by community members to sort out problems.
All the staff roles benefit the community as not only does the Trust provide them with employment but without them the Trust would not be able to distribute grants or fulfil the community’s aspirations as detailed in the Community Action Plan and Local Place Plans.
2.3 Staff Costs
We will not divulge individual’s salaries as GDPR defines this as personal data. As stated in the 24/25 Published accounts, the total staffing costs was £193,421 including NI and pensions.
3. Professional and Consultancy Costs
As with staffing costs, these costs fall into the three categories, organisational, assets and community facing.
As a small organisation we have established ongoing arrangements with professional companies for legal, HR and architectural support which we call on as and when required.
In addition, we have contracts with local firms to mow the grass (and remove the snow), clean windows, empty septic tanks and generally keep the Trust’s estate presentable. There is also a contract cleaner for the toilets at Inverfarigaig and Errogie. We also often need to call on local carpenters and electricians to fix things.
For community facing projects and activities, any professional or consultancy costs are either incorporated in the project budget or, as with the forthcoming Gala and reCAP consultancy costs, our Funding and Development Officer were able to secure grants from other funders (National Lottery and Scottish Government respectively).
We will not provide a breakdown of individual contracts as this is commercially confidential data. As stated in the 24/25 Published accounts, Legal & professional fees cost £38,393 and Repairs & maintenance £39,588.
4. Projects
All projects undertaken by the Trust, in the past, involved community consultations, were aligned to the Community Action Plan and/or Place Plan and a business case presented for approval by the Board. I am not aware of any prioritisation or evaluation process as many of the past projects were started because of opportunities arising in the community (e.g. Riverside Field, Errogie Church).
It was realised there was a lack of strategic planning and that the Trust needed to complete the projects which have been outstanding for years. To this end we developed a Strategic Planning Process (Appendix 1) and an Operational Project Planning Timeline (Appendix 2).
For the ‘26-’27 projects we undertook an evaluation process which saw five projects, described in a mixed concept/business case proposal, evaluated against agreed criteria and scored to establish the priority order for delivery. Appendix 3 details the evaluation criteria and the prompts used to identify the evidence required.
5. Riverside Field
Full details of the consultation work undertaken to date can be found here: https://stratherrickcommunity.org.uk/projects/Riverside-Field-Foyers/
We also provided a community update on 25 June, which outlined the current proposals and how feedback received through consultations has influenced the plans. You will see from this update that provision has been included for community growing opportunities, including areas dedicated to vegetable cultivation, as well as tree planting and biodiversity improvements throughout the site.
In addition, we held meetings with neighbours of the site at an earlier stage of the project, and the current plan is based very much on the vision and priorities that were agreed through those discussions.
The perimeter path has been part of the vision from the outset. It was identified through the original working group established to explore future use of the site, which included representatives from BCC, the Parent Councils and many other stakeholders. The vision was for a safe, accessible multi-use perimeter path that could be used by walkers, runners, families, wheelchair users and cyclists, creating opportunities for recreation, active travel and improved community access to the wider site. Similar paths have been created in Fort Augustus, Inverarnie and Torvean in Inverness. We are running two trips to view the path in Fort Augustus for anyone in the community to take a look at it if you wanted to attend one of them.
The small pump park was a more recent consideration. This followed receipt of handwritten letters from young people in the community who requested a safe, off-road area where they could ride their bikes. Their feedback highlighted a need for dedicated facilities for younger residents and has been considered as part of the evolving proposals. We are still working on this proposal.
The perimeter track and pump park were not considered in isolation from other ideas. The proposals have evolved through a combination of consultation feedback, engagement with residents and stakeholders, feasibility considerations, funding opportunities and the aspirations identified through the Community Action Plan. As the project develops, we remain committed to engaging with the community and refining the plans to ensure they deliver a range of benefits for people of all ages and interests that will improve health and wellbeing.
The Riverside Field project has evolved considerably since the land was first purchased. While it was always intended to be delivered as a phased project, with some of the larger elements planned for later phases, we have listened carefully to community feedback as the project has progressed. As a result, we have allowed the previous Planning in Principle consent for the larger-scale development to lapse last year and have significantly scaled back the current proposals.
As outlined in the community update of 25 June, the focus is now on delivering a single, more modest phase that reflects current community priorities and available resources. Once this phase has been completed, any future development or improvements to the site will be guided by further engagement with the community, ensuring that residents have a meaningful role in shaping the future of Riverside Field.
6. Community Input to Major Decisions
We currently have an external contractor leading on a review of the CAP which is 5 years old. From this exercise, which involves an online survey and community meetings, we will understand the communities opinions on which CAP Themes they prioritise. From this we will follow the Strategic Planning Process and seek project ideas from the communities. We will liaise with communities and will put forward concept papers detailing their requirements for consideration by the Board.
It is also important to recognise that community input varies depending on the nature of the decision being made. For example, the purchase of the Riverside field arose directly from community demand, with a petition established by local residents requesting that SFCT acquire the land. SFCT subsequently purchased the field with funding from the Scottish Land Fund.
Other decisions are informed through surveys, consultations and community engagement activities. The CAP itself was developed following extensive community consultation and continues to guide our work and priorities. While we are guided by the CAP, we still regularly consult with the community on specific projects and proposals, and we always welcome direct contact from community members who wish to share ideas, concerns or feedback.
The Trust would welcome community input into what they consider to be a ‘major’ decision’ and also, how else we could encourage community input into these decision processes.
7. Financial information
We recognise that statutory accounts are prepared to meet legal and accounting requirements and are not always the easiest documents for everyone to interpret.
The Trust is always open to improving the way it communicates financial information to the community. We would be happy to consider whether additional summaries or explanations could accompany the published annual accounts, or be provided at the AGM, to help members better understand how funds have been used during the year.
As a small organisation with a largely part-time staff team, we also need to ensure that any additional reporting is proportionate and does not detract from delivering projects or meeting our statutory and funder reporting obligations. Our aim is to provide information that is both meaningful and accessible, whilst making the best use of the Trust's resources.
8. Board meetings or community meetings online
There are several reasons why Board Meetings are conventionally held in private, and there are basically two underlying causes for this occurring.
Firstly, from an operational perspective, a Board may have to consider confidential practical matters such as staff wages, employment conditions, or perhaps a Grant Applicant’s personal details. It is accepted that the Board of SFCT may not necessarily be constantly involved in huge commercial decisions that may be sensitive, but they must certainly consider strategic issues and projects involving our Community. It is very easy for discussions around such matters to be misconstrued or misinterpreted, which can lead to incorrect speculation.
There is also the question of decision making. Not all decisions are unanimous. Although it is the task of the Chair to seek a consensus that is not always achievable, but once a decision is made, it is the duty of all Directors to be in support. Some, on a personal basis, may not be in agreement, and that choice will always be respected - but it serves no purpose to publicise this and would be counter-productive if division was evident in public.
Board meetings must therefore ensure the freedom of Directors to be open and frank, with honest, candid debate. If there is disagreement, then Directors must be free to criticise and question proposals.
So, this leads to the second underlying cause for privacy – and this is perhaps the most important. Discussions must be candid, with the rights and wrongs evenly heard, without the fear of repercussions or criticism. If an attempt were made to hold meetings in public, it would undoubtedly stifle open debate. SFCT Board meetings are far from “cosy chats”, often being heated, with very lively discussion. This serves to bring about joint, collective decisions made without fear or favour, in the knowledge that all Directors have openly expressed their full opinion. This would be unlikely in a public forum.
It is understood that some in the Community would wish to have greater knowledge of what occurs in the Board Meetings, but a Company’s Minutes should only record the subject or proposal that is being made and the decision of the Board. To record the full conversations that occur is impractical and would be, frankly, tedious and of little use. We try to give some context to the decisions made but must balance that by summarising as best we can briefly what was proposed and what the Board decided.
To really find out what happens at Board Meetings if anyone was so minded, every year there are opportunities to join the Board and play a very active part. Rest assured an awful lot goes on between Board Meetings and it is a very interesting organisation in which to become involved. There is also an AGM held very November where Members can ask questions and seek clarification on anything that may concern them. We have also instigated a twice yearly joint open meeting with the Community Council, where everyone is encouraged to attend and ask questions from the floor. In addition, contact details for Directors and Staff are on our website and we actively encourage community members to be in touch. There are staff in Wildside most weekday mornings and Jewels, our CEO, is more than happy to explain projects and proposals or deal with general enquiries. In summary, there are lots of ways to get answers to your questions – just give them a try – you might be surprised!
Our message is that we must preserve some confidentiality, be it for personal, legal or commercial reasons – but there are no secrets. Why would there be?
Appendix 2 Operational Project Timeline

Appendix 3
Trust Project Proposals
(Concept Papers)
Evaluation Framework for 2026-2027 Projects
The Evaluation Framework
Each concept paper will be evaluated against seven criteria:
- Strategic Context & Alignment
- Community Impact
- Operational Feasibility
- Financial Viability of both Project & Operational Costs
- Monitoring & Evaluation
- Sustainability & Legacy
- Innovation & Added Value
For each of the criteria on the Evaluation form we have added prompts to highlight the type of evidence we want you to evaluate.
Evaluation Form Prompts
Strategic Context & Alignment
- Community Need: Is the community need clearly defined and supporting evidence provided?
- Trust Objectives: Does the proposal clearly support one or more of the trust’s strategic aims or CAP themes (e.g. social housing, transport, local welfare, heritage, sustainability)?
- Policy Fit: Is it aligned with national frameworks like the Scottish Government’s Community Empowerment Act, Local Place Plans, or Just Transition principles?
Community Impact
- Local Benefit: Who benefits—residents, volunteers, visitors? Is it inclusive of vulnerable or under-represented groups?
- Consultation Evidence: Has the proposal been shaped by community input or participatory processes?
- Legacy Potential: Will it leave lasting infrastructure, skills, or social capital?
Operational Feasibility
- Delivery Plan: Are timelines, milestones, and responsibilities clearly defined?
- Staffing & Volunteers: Are roles realistic given local capacity? Does it require recruitment or training?
- Risk & Mitigation: Are risks identified and managed appropriately?
Financial Viability of both Project & Operational Costs
- Budget Clarity: Are the budgets detailed, justified, and proportionate?
- Ongoing Maintenance: Can the trust or community sustain it post-delivery?
- Funding Sources: Are grants, match funding, or in-kind contributions secured or realistic?
- Value for Money: Does the cost reflect the scale and depth of impact?
Monitoring & Evaluation
- Reporting: Is there a plan for sharing progress with trustees, funders, and the community?
- Success Measures: Are there clear KPIs or outcomes linked to strategic goals?
- Evaluation: Will the project produce an end of project report and evaluate the project? Does it identify how evaluation will be undertaken: participatory evaluation, scoring matrices, or quality management systems?
Sustainability & Legacy
- Environmental Impact: Does it support climate resilience, environmental sustainability or biodiversity?
- Replicable: Could it be scaled up or adapted for other rural areas?
Innovation & Added Value
- Innovation: Does the project bring something new or enhances existing work or activities?
- Added Value: Does it build or enhance local capacity or partnerships?
- 2026
- July (4 stories)
-
9 July
Community Money, Community Questions
The Trust is aware of posts on social media which pose some pertinent questions about how the Trust operates and manages the Community Benefit Funds it receives. We are p... -
8 July
π Community Minibus Trip β Inverness Highland Games! π
When: Sat 11th July β Join SFCT for a FREE community minibus trip to the Inverness Highland Games at Bught Park – one of the Highlands' most iconic... -
2 July
Community Visit to The Old Convent Land, Fort Augustus
Join us for a community outing to Fort Augustus to explore the beautiful Old Convent Land walking trails and woodland area. The project has been a source of ... -
1 July
π Community Minibus Trips for July! π
We're delighted to share our July Community Minibus programme! Whether you're joining us for a coffee morning, a shopping trip, a community event or a day out, we... - June (15 stories)
-
25 June
Riverside Field Project Update β June 2026
Following the Stratherrick & Foyers Community Trust Board of Directors meeting in June 2026, we are pleased to provide an update on the Riverside Field project in Low... -
23 June
π¨ Final week to complete the reCAP survey!
There's still time to have your say on the future of our community. The updated Community Action Plan will help shape priorities and guide future community benefit... -
22 June
π Mobile Library Visiting This Wednesday
The Mobile Library will be in Whitebridge this Wednesday morning, so pop along and say hello to Mark! π Stopping point & time: • Whitebridge &ndas... -
18 June
The reCAP survey closes on the 30th of June.
The reCAP survey closes on the 30th of June. This is your opportunity to help shape future priorities for our community and influence how community benefit f... -
17 June
πβ¨ A Night at the Musicals β This Friday! β¨π
Join Sing In The Strath for their very first concert, “A Night at the Musicals – A Journey Through Time”, celebrating iconic songs from stage and screen... -
17 June
Animals at The Wildside Centre
We are delighted that the Wildside Centre has been visited by so many furry friends this year, and the play park continues to entertain our younger members. So with respe... -
16 June
πͺπ» Traditional Music Session β Everyone Welcome! πΆ
Love traditional music? Come along and join Kirsteen & Jack at The Wildside Centre on Saturday 20th June from 2pm for an afternoon of tunes, music, and great company.... -
12 June
π Mobile Library Visiting Next Week - 16th June! πβ¨
The Mobile Library will be in the area next Tuesday morning, so pop along and say hello to Mark! π Stopping points & times: • Errogie ... -
11 June
South Loch Ness Heritage Group Visit Brora & Helmsdale with the Community Minibus
On Saturday 6th June, the Stratherrick & Foyers Community Trust Community Minibus helped the South Loch Ness Heritage Group travel to the north of the Highlands for a... -
10 June
The South Loch Ness Swift Project
The South Loch Ness Swift Project is looking for folk to help survey these birds and for house-holders who are willing to provide a home for Swifts by installing a nest-b... -
9 June
β° Have you completed the reCAP survey yet?
The Community Action Plan has helped guide local priorities over the last five years, but now we need your views on what should happen next. Whether you'... -
8 June
β Fancy a coffee and a catch-up?
Join BCC on Wednesday 10th June for a Coffee Morning at the Hub, with a stop at Foyers Stores. β Free transport β Advance booking required β Friendly c... -
3 June
Grants Deadline - June 21
π¨ Don’t miss out! π¨ There’s still time to apply for our latest round of grant funding - but be quick! The deadline is the 21st of June β³ Got a project... -
1 June
π’ reCAP β Refreshing the Community Action Plan
Back in 2021, the Community Action Plan (CAP) was created to help guide what we as a community would focus on over five years - including how to make the best use of the ... -
1 June
π Community Minibus Trips β June 2026 π
We’re delighted to continue offering our FREE Community Minibus Trips, helping local people stay connected, access services, and enjoy days out in the community. ... - May (11 stories)
-
29 May
reCAP - Coming June 1st.

-
28 May
Community Minibus - Drivers Wanted
We are on the lookout for new drivers to help keep up with the demand of our popular Community Minibus scheme. Since our new minibus was secured back in March, w... -
27 May
π Calling all musical lovers! πΆ
Sing In The Strath are holding their very first concert on the 19th June - and if you’re a fan of musicals, this is definitely for you! Join the group ... -
20 May
Mobile Library - Wed 27th at The Wildside Centre
The Mobile Library will be back at The Wildside Centre a week today! Why not pop by say hello to Mark, the fantastic librarian and browse the selection of books availa... -
18 May
π Exciting news from the Errogie Church Community and Culture Group
An exciting update from the Errogie Church Community and Culture Group We are pleased to say that the doors to Errogie Old Church will shortly be openin... -
18 May
π Mobile Library Visiting Tomorrow β 19th May! πβ¨
The Mobile Library will be in the area tomorrow morning, so pop along and say hello to Mark! π Stopping points & times: • Errogie – Yellow B... -
13 May
Become A Member
We encourage every person living in the community to become a Member of the Trust. It’s free to join and gives you the opportunity to influence how the company is r... -
12 May
Traditional Music Session - 16th May
Looking for a fix of traditional Scottish tunes? Why not head along to the Wildside Centre this Saturday from 2pm, where Kirsteen & Jack return wit... -
6 May
π Community Minibus Trips for May! π
We’re really pleased to be able to offer our Community Minibus trips again this May, and we continue to hear just how valuable they are to local people π ... -
5 May
Thank you from SFCC & SFCT
Both the Stratherrick and Foyers Community Trust and the Stratherrick and Foyers Community Council would like to say a big thank you to everyone who came along to the Com... -
1 May
Ultra X - 2nd & 3rd May - (This weekend)
Reminder that Ultra X is taking place this weekend - (2nd/3rd May). The group will be utilising the Wildside Centre, Inverfarigaig Centre and Foyers Bay Compound. &nbs... - April (11 stories)
-
30 April
Family Ceilidh - Sunday 3rd May
Head along for a fun-filled Family Ceilidh at Stratherrick Public Hall this Sunday, 3rd of May from 2–4pm! ππΊ Enjoy an afternoon of Scottish dancing ... -
29 April
Agenda for tonight's joint meeting with SFCC & SFCT
Community Conversations with Stratherrick & Foyers Community Council & Stratherrick & Foyers Community Trust Tonight - 29th April, 7pm at The Wil... -
29 April
Etape Success - Record numbers at Wildside!
Just in case anyone was wondering what on earth was happening, last Sunday saw the cycling event “Etape Loch Ness” visit our area. You may know that the event... -
24 April
Highland Gathering Update 2026
We wanted to let everyone know that we won’t be holding the Gathering this year. This decision was not taken lightly. It reflects the need to make some cost sa... -
22 April
Foyers Field Update
We would like to provide a wider community update on the field in Lower Foyers owned by SFCT, is currently being re-explored for possible future community use. Throughout... -
13 April
Community Conversations with SFCC & SFCT
Following joint working between Stratherrick & Foyers Community Trust (SFCT) and Stratherrick & Foyers Community Council (SFCC), we are launching a series of Comm... -
8 April
Community Leisure Steering Group - 15th April
Stratherrick & Foyers Community Trust invites all members of the community to join the Community Leisure Steering Group. This follows the Riverside Field... -
8 April
Riverside Community Conversation - Thank you
SFCT would like to thank everyone who has supported the conversation around the future of Riverside Field, and especially those who attended the meeting on Thursday 2nd A... -
7 April
APRIL MINIBUS TRIPS
Our brand new community minibus has arrived and we’re so excited to welcome you on board! We’ve got some fantastic trips lined up throughout April — tak... -
7 April
Art Group Meeting - Tomorrow at The Hub 7pm
Do you enjoy art? Whether you love crafting, creating, or simply admiring, this could be for you! A new local art group is being set up - a space to share id... -
1 April
Statement from our CEO
The Trust is pleased to announce a new category of grant we offer to support local community groups and individuals, particularly farmers who reside in the area. After le... - March (17 stories)
-
31 March
πͺπ» Traditional Music Session β Everyone Welcome! πΆ
Break out your bodhrán and fine-tune your fiddle! π» Join Kirsteen & Jack at The Wildside Centre on Saturday 4th April from 2pm for a traditional music sess... -
31 March
Community Conversation - Riverside Field
SFCT is keen to re-open discussions around the proposed use and development of Riverside Field. We want to approach this next stage with a practical and collaborative min... -
26 March
Highland Musicians stop at The Wildside Centre Tomorrow for Charity Cycle
π»π΄βοΈ ONLY 1 DAY TO GO! Highland musicians are gearing up to hit the road this Friday 27th March - cycling Inverness to Oban for the incredible My Name... -
25 March
π±β¨ The Spring Magazine Has Arrived! β¨π±
We’re excited to share that the 2026 Spring Magazine from Stratherrick & Foyers Community Trust is now live and ready to view online! Yes, it might... -
24 March
πΏβ¨ BIG NEWS from The Wildside Centre! β¨πΏ
We have officially launched a new Facebook page for the centre - and you’re invited to be part of the adventure! Hit that follow button to keep up with... -
23 March
π Mobile Library Visiting Tomorrow! πβ¨
The Mobile Library will be in the area tomorrow morning, so pop along and say hello to Mark! π Stopping points & times: • Errogie – Yellow... -
19 March
π¬The Screen Machine is rolling back into Fort Augustus next week!
Join them from 22nd – 24th March for a fantastic selection of films right on your doorstep. πΏβ¨ Check out what’s showing and book your tickets he... -
18 March
Join 'Sing In the Strath' next Fri 27th March
πβ¨ Love musicals? Want to be part of something special this summer? Why not join Sing In The Strath for an informal evening on Friday 27th March from 7:30pm... -
18 March
Step aboard the Metagama and set sail on an unforgettable musical journey
This Saturday (21st March) at Stratherrick Public Hall, experience a powerful live stage show telling the story of 1920s mass emigration from the Hebrides - from Scotland... -
17 March
Grants Update
π¨ Don’t miss out! π¨ There’s still time to apply for our latest round of grant funding - but be quick! The deadline is 21st March β³ ... -
17 March
Boleskine Biodiversity Group Workshop - This Sat
πΏ Why not head along to Inverfarigaig Forest School this Saturday for a fascinating day in nature? Join the Boleskine Biodiversity Group for a Wildlife Trac...
-
12 March
Highland musicians will set off on a Coast-to-Coast cycle from Inverness to Oban
π»π΄βοΈ The countdown is on! In just a couple of weeks, Highland musicians will set off on a Coast-to-Coast cycle from Inverness to Oban to raise funds f... -
10 March
π Community Minibus Trips Are Back This March! π
Our minibus service is continuing through March, and we’re so excited to welcome you on board! There are a number of fantastic trips planned throughout... -
9 March
β¨ Fused Glass Workshop β This Saturday! β¨
Join the Dizzy Glass Workshop at The Hub on Saturday 14th, 10am–1pm and create your own beautiful fused glass piece. Book your place by emailing anders... -
4 March
Forestry & Land Apprentice Opportunity
π² We thought we’d share this update from Forestry and Land Scotland, which may be of interest to people in the area. They’re currently recruitin...
-
4 March
β° Happening TODAY! β°
Changeworks will be at The Wildside Centre later this morning (4th March) for a FREE drop-in session from 11am–1pm, offering friendly, impartial energy advice. &... -
3 March
π¨ JOB FAYRE POSTPONED π¨
Unfortunately, due to circumstances out with our control, we are sad to announce that we must postpone our Local Jobs Fayre scheduled to take place tomorrow (4th March) a... - February (15 stories)
-
25 February
Update regarding transfer of funds to support BCC
We would like to share a brief update with our community on the progress of transferring funds to support Boleskine Community Care in the purchase of the Foyers Shop and ... -
25 February
π¨ NEW EVENT β Local Jobs Fayre at The Wildside Centre! π¨
We’re excited to be hosting a Local Jobs Fayre next Wednesday here at The Wildside Centre! π Next Wednesday - 4th March β° 11am – 1pm π Free t... -
24 February
πΏπ Community Support in Action at Stratherrick Nursery! ππΏ
Stratherrick Nursery has recently completed a fantastic new outdoor sandpit, made possible thanks to the generous donations from members of the local community. ... -
24 February
Spring Magazine Deadline is Almost Here!
The deadline to submit content for our upcoming Spring Magazine is this Friday, 27th February! There’s not much time left to get involved! If you have:... -
21 February
Step aboard the Metagama and set sail on an unforgettable musical journey β¨
An ensemble of acclaimed musicians and singers bring to life the powerful story of 1920s mass emigration from the Hebrides — travelling from Scotland’s shores... -
17 February
Send us your Spring photos
πΈ We’re welcoming spring! πΈ Our Spring Magazine is on the way, and we’re inviting the community to share your favourite spring-themed photos an... -
17 February
What a match!
Thanks to those of you who came down to The Wildside to watch the Scotland v England game! What an atmosphere. What do you want to see next? Please sha... -
12 February
π’ Calling Local Employers!
We’re considering hosting a local Jobs Fayre at The Wildside Centre in early March and would love for you to get involved. If you’re currently re... -
10 February
Join our Events Committee
Do you love events? Are you organised, creative, or full of ideas for bringing people together? Would you like to help shape what happens in our community throughou... -
10 February
π Community Minibus Service is Back!
Great news! Our community minibus service is back as of February π We’ve got a lovely selection of trips lined up for this month, check them out below π &nb... -
6 February
πΌ Let Your Words Bloom This Spring πΌ
We are starting to pull together our 2026 Spring Magazine Special, to help do this, we are now looking for fantastic articles to feature! Do you have a story... -
5 February
Urgent update regarding the Foyers Stores acquisition
We are delighted to confirm that following SSE’s approval of the Stratherrick and Foyers Community Trust Board’s recommendation we have approved the grant app... -
4 February
π£ Noticeboard Update!
We have recently moved our noticeboard to the reception area within the Wildside Centre! Business cards now have their own dedicated board. If you run a local business... -
3 February
π Mobile Library Visiting Tomorrow! πβ¨
The Mobile Library is rolling into the area tomorrow, Wednesday 4th February, so pop along and say hello to Mark! Stop & time: • The Wildside Centre &ndash... -
3 February
RSABI Fundraising Event
Don't miss out on an incredible evening of music and laughter with the talented Farmers Choir performing in Aviemore late February in aid of RSABI and SAYFC.  ... - January (12 stories)
-
28 January
Six Nations: Scotland π England LIVE at The Wildside
π This Valentine’s Day, find someone who loves you as much as you love rugby π We’re streaming Six Nations: Scotland π England LIVE at The Wil... -
27 January
π³ Development of Inverfarigaig Forest School π³
A community member has been in touch about the possibility of setting up a Forest School within our community. With the support of the Community Trust, a short survey has... -
26 January
π Mobile Library Visiting Tomorrow! πβ¨
The Mobile Library will be in the area tomorrow, Wednesday 27th January, so pop along and say hello to Mark! π Stopping points & times: • Errogi... -
22 January
π₯ Free Firewood Available β Whitebridge Area π₯
A member of our local community, has been in touch with Stratherrick & Foyers Community Trust (SFCT) to let us know that he has a significant amount of larch firewood... -
21 January
Large grant application from BCC for Foyers Stores Acquisition - Update
A Board meeting is taking place this evening in order for Directors of SFCT to consider the application and agree their recommendation. As the Chair of SFCT explained at ... -
20 January
Thank you!
Thank you to everyone who came along to the public meeting at the Wildside last night. We had a fantastic turnout, with 110 people attending in person and 26 joining u... -
19 January
Agenda for Public Meeting - Regarding the Foyers Stores Acquisition
Please find the agenda for tonight’s public meeting at the Wildside Centre regarding the proposed community acquisition of Foyers Stores. 1. Welcome &n... -
14 January
Apply for ourΒ Project CoordinatorΒ role
π Friendly reminder! There’s still time to apply for our Project Coordinator role at Stratherrick and Foyers Community Trust ... -
8 January
Notice to the Community: Change of Date for Public Meeting on Foyers Stores
Stratherrick and Foyers Community Trust (SFCT) would like to update the community regarding the previously announced public meeting relating to the proposed purchase of F... -
7 January
π New Year, New Opportunities! π
Stratherrick & Foyers Community Trust is here to support your projects with our grants! π‘β¨ π Next application deadline: 21st March 2026 Learn more about ... -
6 January
π Calling all community organisers! π
Do you run a class, group or one-off activity in one of the local buildings? We’d love to help spread the word! π Our SFCT Community Calendar is looking a ... -
6 January
Mobile Library Visit Cancelled β Wednesday 7th January 2026
π Hello and welcome to 2026 from SFCT! π We bring news from the Mobile Library as our first update of the year. π Mobile Library Visit Cancelled – Wednesday ...
Stratherrick & Foyers Community Trust,